Over the Edge was hired with their Spider Excavator to remove a beaver dam in a park in Langley B.C. The only access was down a small path 7ft wide. Because of the Kaiser S2’s ability to “shrink” down to 7ft, we were able to access the site with no damage to park. In addition, with our Grapple bucket, we were able to slowly pull the beaver dam apart and let the water out at a controlled rate limiting turbidity.
Mountain Highway Topsoil Placement
Over the Edge was hired to place topsoil on steep slopes around the mountain highway and hwy1 improvement project.