Over the Edge was contacted and hired to mobilize equipment for temporary response. Over the Edge was called due to the challenging access into the site. The site was located in the Fraser canyon North of Big Bar. The only access was a 250M slope in excess of 100% or constructing a road. Through the use of a remote controlled T-Winch and safety precautions we were able to quickly access the site and start moving the machine into the slide area creating access and lay down area for large support equipment at a later date.
Mountain Highway Topsoil Placement
Over the Edge was hired to place topsoil on steep slopes around the mountain highway and hwy1 improvement project.