We used our spider excavator to divert 11 Mile creek away from the bridge abutment footing in order for the highway maintenance crew to repair the undermined footing. After the repair was completed, Over the edge armored both sides of the creek, protecting the footing. In addition, 2 Grade Control Structures(weirs) were installed, one under the bridge and the other at the outflow of the bridge. These significantly slowed the water.