The District of Kent hire Over the Edge with its spider excavator to clean a highly sensitive creek with limited access in multiple locations. The Second part of the job was to construct a frog habitat for the “Oregon Spotted Frog,” an endangered species. For this we had to build an island and installing log poles.
Mountain Highway Topsoil Placement
Over the Edge was hired to place topsoil on steep slopes around the mountain highway and hwy1 improvement project.