Over the Edge was hired to divert Hunter Creek away from washout, place and compact material in washout and place riprap on the slope under the bridge. The spider was the right machine for the job because it runs biodegradable lubricants, its ability to sit on slopes, lift large riprap and reach up into low clearance areas.
![hwy-1-bridge](https://overtheedgeexcavating.ca/wp-content/uploads/2020/05/hwy-1-bridge.jpg)