Over the Edge was hired to place topsoil on steep slopes around the mountain highway and hwy1 improvement project.
Lorenzetti Creek Bank Armouring
Over the edge was hired to divert Lorenzetti Creek around the work area, install rip-rap and logs with root wads to reinforce the stream bank.