Using our spider excavator equipped with a grapple bucket to place steps up to the yoga pad and a rock wall to retain the hillside above the pad. All the rock walls and steps were made with rocks found onsite.
Mountain Highway Topsoil Placement
Over the Edge was hired to place topsoil on steep slopes around the mountain highway and hwy1 improvement project.